108-D5
Timer Controlled Beacons

Designed for low speed roadways where pedestrians are present, and to warn vehicular traffic they are entering an area requiring extra caution. The 7 day timer system can be activated at certain times of the day to emphasize its effectiveness.


The Solar School Zone only utilizes the most up to date solar and electronics to maintain power levels thru rain, shine, sleet, or snow


LED technology increases life expectancy of the beacon and also burns less energy than conventional bulbs


Meets MUTCD (Manual on Uniform Traffic Control Devices)



The 7 day Programmable timer module allows you to program in advance what times the beacons will be activated.


The system fits into Safe Routes to School (SRTS) infrastructure funding models


NCHRP 350 Crash Tested and Accepted (National Cooperative Highway Research Program)


Meets ITE Standards (Institute of Transportation Engineers)


 
 

* Shown with optional signage and
Round Aluminum Crash Tested Pole

 

AC-OPT5  For Model:  108-D5.  Remove 5W solar panel, solar panel mounting bracket, battery, large battery box and regulator.  Add 20W power supply and small control cabinet.

Question: How long does the battery last?

Answer: Typically the average life span of a battery is anywhere from 3-5 years.

 

Question: If I furnish my own battery or need to replace, what type do I need?

Answer: Sealed 7.5 amp hour deep cycle battery.

 

Question: Do you provide a battery with the system?

Answer:  Yes, we provide one 7.5 amp hour battery.

 

Question: What is the typical battery backup? (days to run without solar input)

Answer: Our standard systems have at least 7-10 days of battery backup.

 

Question:  Does signage come with the unit?

Answer:  Our standard system does not come with a sign but it may be purchased as an option. Please see our options tab for further information.

 

Question:  If I purchase the optional signage can the speed limit be modified to meet my existing speed limit?

Answer:  Yes. When you place order or need quote simply inform our sales team of the desired speed limit.

 

Question:  How many hours a day are these systems designed to run?

Answer:  Our Systems are designed to run anywhere from 1-2 hours per day.

 

Question: Do I furnish my own pole or can I purchase one from your company?

Answer:  You can do whichever is most convenient for you. If you would like to use your existing pole simply let us know what type of pole you will be mounting to so we can supply the correct mounting hardware.  If you would like us to provide a pole please see our optional poles under the options tab on the website.

 

Question:  What is the lead time for these systems?

Answer:  Our typical lead time is 4-6 weeks ARO.

 

Question:  Can the system be AC powered?

Answer: Yes, the system can be AC powered.  We will use our standard DC powered system without the solar and add a power supply in its place to convert the ac power coming in to our DC powered system.

 

Question:  Do you provide any installation, mounting, and wiring instructions?

Answer:  Yes, we do provide all this information and more available on our website for each model under “Support Documents”.

 

Question:  How do I program the 7 day timer and is it easy to program?

Answer:  The 7 day timer is easy to program and you will find programming instructions on our website for each model under “Support Documents”.

 

Question:  How large are the beacons?

Answer:  The LED beacons are Par 46 Bulbs with 360 degree visors.

 

Question:  Where are the batteries and controls for this unit?

Answer:  The battery and controls are inside the aluminum cabinet behind LED bulbs.

 

Question:  Do the LED beacons flash alternately with one another or together?

Answer:  The LED beacons flash together since it is in horizontal position; otherwise it would simulate a railroad crossing sign if flashed alternately which would confuse traffic.

108-D5 specs

108-D5 Split Heads Spun Pole Assembly

108-D5 Split Heads U-Channel Post Assembly

108-D5 Split Heads Wood Post Assembly

108-D5 wiring

108-D5-Brochure

INSTALLATION CHECKLIST SOLAR FLASHER BEACON

Pedestal base pattern

PT-7 7 Day Timer Manual

SMSP 5-10 Mounting Kit

SOLAR FLASHER BEACON INSTALLATION CHECKLIST